Ron Revealed to be Liar … Again

Wind 9.6%, 1 – 25 mph, Wales 10 – 25 mph, 0739 local time

June 8, 2017

The effective wind speed in the Betws area now is 5 mph, 14 mph mean wind speed minus 9 mph needed to start the turbines. Their optimal operational wind speed is a steady 20 – 40 mph, such wind speeds never occur in Wales or anywhere in the British Isles or Europe. So wind turbines are completely useless. It has been estimated that their net contribution to total demand (electricity plus fuel) is zero. Solar is 1.93% and hydro 0.7%, both completely negligible. I think that the Trade Union Movement all over Europe should strike permananetly against wind turbines until they are demolished. This would mean that no power could be taken form wind turbines, and none ed to them from the grid. I advocate this because democracy is being ignored. As Mynydd y Gwair is totally destroyed for no purpose, an angry and resentful 90% majority against them looks on in great contempt and seething anger.”

We pointed out recently that these ‘negligible’ sources of energy amounted to nearly 16% of demand during May. And now this:

http://www.telegraph.co.uk/business/2017/06/07/uk-sets-new-renewable-energy-record-wind-solar-surge/

Perhaps you should not cherry-pick data at 6am [sic] each morning. No comment, Ron? If you had not lost your moral compass, you would know which way the wind is blowing.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: